Back to top

Pre Engineering Building

Pre Engineering Building
Pre Engineering Building
Pre Engineering Building
Pre Engineering Building
Pre Engineering Building
Pre Engineering Building

Pre Engineering Building Specification

  • Window Material
  • Life Span
  • Long Life
  • Open Style
  • Inward/ Outward
  • Wall Materials
  • metal Sheet
  • Material
  • Container, Steel, Aluminum sheet, PVC panel
  • Roof Material
  • Steel
  • Window
  • One, Two, Three, Four, Five, Six
  • Window Style
  • Other
  • Color
  • Blue
  • Use
  • Warehouse
 

Pre Engineering Building Trade Information

  • Minimum Order Quantity
  • 1 Unit
  • Supply Ability
  • 1 Unit Per Week
  • Delivery Time
  • 7 Days
 
Tell us about your requirement
product

Price:

Quantity
Select Unit

  • 50
  • 100
  • 200
  • 250
  • 500
  • 1000+
Additional detail
Mobile number

Email